Cleveland Pipeline




Date Panel Temperature (degC) Height (ft) Cleveland Pipeline Flow (cfs)
05/01/2017 0.13 0.00
05/02/2017 0.96 40.45
05/03/2017 1.04 45.84
05/04/2017 1.12 51.36
05/05/2017 1.15 0.00
05/06/2017 -0.28 0.00
05/07/2017 1.03 0.00
05/08/2017 -1.66 0.00
05/09/2017 -2.85 0.00
05/10/2017 -1.85 0.00
05/11/2017 0.47 0.00
05/12/2017 -0.40 0.00
05/13/2017 -1.27 0.00
05/14/2017 -0.79 0.00
05/15/2017 -0.83 0.00
05/16/2017 -0.76 0.00
05/17/2017 -0.75 0.00
05/18/2017 -0.22 0.00
05/19/2017 1.47 77.42
05/20/2017 1.40 71.60
05/21/2017 1.40 71.71
05/22/2017 1.33 66.12
05/23/2017 0.30 0.00
05/24/2017 1.28 62.99
05/25/2017 -1.86 0.00
05/26/2017 -4.33 0.00
05/27/2017 -5.03 0.00
05/28/2017 -3.01 0.00
05/29/2017 -1.99 0.00
05/30/2017 -0.75 0.00
05/31/2017 -0.12 0.00
Average 15.73
Maximum 77.42
Minimum 0.00
Total Volume (AF) 966.69