Date | Battery Voltage (V) | Pond Height (ft) | Gate Opening (%) | Pond RF signal (db) | Pond Battery Voltage (V) | Total Fails (ea) | Tries (ea) | Call Fails (ea) | Auto Level | Pond Set (ft) | Gate Warning | Settle Count | Gate Opening (Scaled) | Spill Height (ft) | Spill CFS (cfs) |
---|