C719 Diversion




Date Battery Voltage (V) Gauge Height (ft) Canal Flow (cfs) Gate 1 Height (ft) Gate 2 Height (ft) Pond (ft) Pond Height (ft) Pond Battery Voltage (V) Pond RF Signal (db) Call Fails Total Fails Tries Auto Pond Pond Set (ft) Gate 1 Warning Gate 2 Warning Gate 1 Up Total Gate 1 Down Total Gate 2 Up Total Gate 2 Down Total Settle Count Auto CFS CFS Set (cfs)
06/26/2019 13.0 -0.01 0.00 -0.10 0.01
06/25/2019 13.0 -0.02 0.00 -0.10 0.01
06/24/2019 13.0 -0.01 0.00 -0.11 0.01
06/23/2019 13.1 -0.01 0.00 -0.11 0.01
06/22/2019 13.1 -0.01 0.00 -0.11 0.01
06/21/2019 12.9 0.13 0.00 -0.11 0.03
06/20/2019 13.0 0.25 4.99 -0.11 0.08
06/19/2019 13.0 0.25 4.99 -0.11 0.08