C719 Diversion




Date Battery Voltage (V) Gauge Height (ft) Canal Flow (cfs) Gate 1 Height (ft) Gate 2 Height (ft) Pond (ft) Pond Height (ft) Pond Battery Voltage (V) Pond RF Signal (db) Call Fails Total Fails Tries Auto Pond Pond Set (ft) Gate 1 Warning Gate 2 Warning Gate 1 Up Total Gate 1 Down Total Gate 2 Up Total Gate 2 Down Total Settle Count Auto CFS CFS Set (cfs)
10/17/2018 13.1 -2.52 0.00 -0.10 -0.01
10/16/2018 13.1 -2.53 0.00 -0.10 -0.01
10/15/2018 13.1 -2.53 0.00 -0.10 -0.01
10/14/2018 13.0 -2.53 0.00 -0.10 -0.01
10/13/2018 13.1 -2.53 0.00 -0.10 -0.01
10/12/2018 12.9 -2.52 0.00 -0.10 -0.01
10/11/2018 13.1 -2.53 0.00 -0.10 -0.01
10/10/2018 13.1 -2.53 0.00 -0.10 -0.01