Moore Diversion




Date Battery Voltage (V) RF % (%) Pipe 1 CFS (cfs) Pipe 2 CFS (cfs) Pipe 3 CFS (cfs) Pipe 4 CFS (cfs) Pipe 5 CFS (cfs) Pipe 6 CFS (cfs) Flume CFS (cfs) Flume Height (ft) Pipe 1 GPM (gpm) Pipe 2 GPM (gpm) Pipe 3 GPM (gpm) Pipe 4 GPM (gpm) Pipe 5 GPM (gpm) Pipe 6 GPM (gpm) Panel temp (degC)
02/01/2019 13.6 0.0 0.1 24.0 0.0 0.0 0.0 11.2 1.97 -2 56 7,999 -3 -3 -4 -2.6
02/02/2019 13.6 0.0 0.1 24.0 0.0 0.0 0.0 11.2 1.97 -2 58 7,999 -3 -3 -4 -1.3
02/03/2019 13.6 0.0 0.1 24.0 0.0 0.0 0.0 11.4 1.99 -2 59 7,999 -3 -3 -4 0.5
02/04/2019 13.6 0.0 0.1 24.0 0.0 0.0 0.0 11.1 1.94 -2 39 7,999 -3 -3 -4 2.7
02/05/2019 13.6 0.0 0.2 23.6 0.0 0.0 0.0 10.5 1.88 -2 113 7,999 -3 -3 -4 1.2
02/06/2019 13.6 0.0 0.2 5.8 0.0 0.0 0.0 9.7 1.79 -2 98 2,620 -3 -3 -4 0.9
02/07/2019 13.6 0.0 0.0 3.0 0.0 0.0 0.0 8.5 1.64 -1 -1 1,371 -3 -3 -4 -5.0
02/08/2019 13.3 0.0 0.0 0.0 0.0 0.0 0.0 8.8 1.67 -1,091 -695 -1,093 -1,091 -1,092 0 -6.7
02/09/2019 12.8 0.0 0.0 0.0 0.0 0.0 0.0 8.6 1.65 -2,650 -1,688 -2,650 -2,650 -2,650 -2,650 -7.4
02/10/2019 12.7 0.0 0.0 0.0 0.0 0.0 0.0 7.9 1.53 -2,650 -1,688 -2,650 -2,650 -2,650 -2,650 -6.3
02/11/2019 12.6 0.0 0.0 0.0 0.0 0.0 0.0 8.5 1.62 -2,650 -1,688 -2,650 -2,650 -2,650 -2,650 -3.4
02/12/2019 12.4 0.0 0.0 0.0 0.0 0.0 0.0 9.2 1.70 -2,650 -1,688 -2,650 -2,650 -2,650 -2,650 -3.5
02/13/2019 12.2 0.0 0.0 0.0 0.0 0.0 0.0 9.1 1.71 -2,650 -1,688 -2,650 -2,650 -2,650 -2,650 -4.2
02/14/2019 12.0 0.0 0.0 0.0 0.0 0.0 0.0 7.7 1.49 -2,650 -1,688 -2,650 -2,650 -2,650 -2,650 -3.0
02/15/2019 11.8 0.0 0.0 0.0 0.0 0.0 0.0 6.8 1.37 -2,650 -1,688 -2,650 -2,650 -2,650 -2,650 -1.8
02/16/2019 11.5 0.0 0.0 0.0 0.0 0.0 0.0 9.7 1.77 -2,650 -1,688 -2,650 -2,650 -2,650 -2,650 0.6
Average 0.0 0.1 8.0 0.0 0.0 0.0 9.4
Maximum 0.0 0.2 24.0 0.0 0.0 0.0 11.4
Minimum 0.0 0.0 0.0 0.0 0.0 0.0 6.8
Total Volume (AF) 0.0 1.6 254.6 0.0 0.0 0.0 297.3