Abraham Canal at Head




Date Battery Voltage (V) CFS_SET (cfs) Auto CFS Water Upstream Head (ft) Water Downstream Head (ft) Canal Flow (cfs) Canal Gate Height 1 (ft) Gate 1 Warning Communication Tries Communication Fails Current Fails Gate Opening (ft)
07/01/2017 13.2 1.13 0.70 68 1.89
07/02/2017 13.1 0.95 0.60 52 1.34
07/03/2017 13.2 0.80 0.53 40 1.00
07/04/2017 13.2 0.67 0.56 30 0.56
07/05/2017 13.1 0.67 0.58 30 0.51
07/06/2017 13.1 0.67 0.59 30 0.47
07/07/2017 13.1 0.80 0.48 40 0.94
07/08/2017 13.1 0.83 0.22 42 1.09
07/09/2017 13.1 0.80 0.42 40 1.00
07/10/2017 13.1 0.78 0.54 38 0.94
07/11/2017 13.1 0.96 0.59 53 1.44
07/12/2017 13.3 1.08 0.50 63 1.74
07/13/2017 13.2 1.10 0.43 64 1.76
07/14/2017 13.2 1.11 0.46 66 1.79
07/15/2017 13.2 1.03 0.47 60 1.60
07/16/2017 13.1 0.91 0.50 50 1.24
07/17/2017 13.2 0.85 0.62 44 1.03
07/18/2017 13.1 0.81 0.66 40 0.68
07/19/2017 13.1 0.75 0.61 36 0.70
07/20/2017 13.2 0.69 0.53 33 0.68
07/21/2017 13.2 0.88 0.08 49 1.31
07/22/2017 13.1 0.84 0.10 49 1.41
07/23/2017 13.1 0.85 0.17 50 1.46
07/24/2017 13.1 0.83 0.16 49 1.49
07/25/2017 13.2 0.83 0.12 45 1.31
07/26/2017 13.4 1.21 0.45 76 2.27
07/27/2017 13.1 1.22 0.56 77 2.41
07/28/2017 13.1 1.19 0.39 74 2.56
07/29/2017 13.2 1.20 0.26 74 2.74
07/30/2017 13.2 1.09 0.48 66 2.50
07/31/2017 13.4 0.85 0.00 44 1.61
Average 0.00 51
Maximum 77
Minimum 30
Total Volume (AF) 0.00 3,117