Abraham Canal at Head




Date Battery Voltage (V) CFS_SET (cfs) Auto CFS Water Upstream Head (ft) Water Downstream Head (ft) Canal Flow (cfs) Canal Gate Height 1 (ft) Gate 1 Warning Communication Tries Communication Fails Current Fails Gate Opening (ft)
03/01/2019 13.1 -2.12 0.00 0 -0.04
03/02/2019 13.2 -2.12 0.00 0 -0.04
03/03/2019 13.0 -2.12 0.00 0 -0.04
03/12/2019 13.1 -2.11 0.00 0 -0.04
03/13/2019 13.2 -2.10 0.00 0 -0.04
03/14/2019 13.4 -2.10 0.00 0 -0.04
03/15/2019 13.3 -2.09 0.00 0 -0.04
03/16/2019 13.1 -2.09 0.00 0 -0.04
03/17/2019 13.1 -2.09 0.00 0 -0.04
03/18/2019 13.1 -2.09 0.00 0 -0.04
03/19/2019 13.2 -2.09 0.00 0 -0.04
03/20/2019 13.1 -2.09 0.00 0 -0.04
Average 0 0
Maximum 0
Minimum 0
Total Volume (AF) 0 0