Abraham Canal at Head




Date Battery Voltage (V) CFS_SET (cfs) Auto CFS Water Upstream Head (ft) Water Downstream Head (ft) Canal Flow (cfs) Canal Gate Height 1 (ft) Gate 1 Warning Communication Tries Communication Fails Current Fails Gate Opening (ft)
09/01/2017 13.2 0.43 0.31 17 0.17
09/02/2017 13.1 0.25 0.00 7 0.07
09/03/2017 13.1 0.15 0.00 3 0.00
09/04/2017 13.1 0.15 0.09 3 0.00
09/05/2017 13.1 0.43 0.29 16 0.24
09/06/2017 13.1 0.59 0.34 25 0.43
09/07/2017 13.1 0.48 0.43 20 0.15
09/08/2017 13.2 0.33 0.00 10 0.17
09/09/2017 13.1 0.12 0.00 6 0.06
09/10/2017 13.2 0.16 0.00 5 0.06
09/11/2017 13.1 0.27 0.00 8 0.11
09/12/2017 13.1 0.15 0.00 3 0.01
09/13/2017 13.1 0.29 0.00 10 0.21
09/14/2017 13.1 0.59 0.00 24 0.49
09/15/2017 13.3 0.58 0.00 24 0.48
09/16/2017 13.2 0.42 0.00 15 0.27
09/17/2017 13.2 0.34 0.00 11 0.19
09/18/2017 13.2 0.13 0.00 2 -0.01
09/19/2017 13.1 0.13 0.00 2 -0.01
09/20/2017 13.2 0.27 0.12 8 0.13
09/21/2017 13.1 0.12 0.01 2 0.00
09/22/2017 13.1 0.06 0.00 1 -0.04
09/23/2017 13.3 0.06 0.00 1 -0.04
09/24/2017 13.3 0.06 0.00 1 -0.04
09/25/2017 13.3 0.06 0.00 1 -0.04
09/26/2017 13.2 0.06 0.00 1 -0.04
09/27/2017 13.2 0.05 0.00 1 -0.04
09/28/2017 13.1 0.06 0.00 1 -0.04
09/29/2017 13.3 0.06 0.00 1 -0.04
09/30/2017 13.1 0.06 0.00 1 -0.04
Average 0.00 8
Maximum 25
Minimum 1
Total Volume (AF) 0.00 456