Canal A Control




Date Battery Voltage (V) Canal Gate Height 1 (ft) Canal Gate Height 3 (ft) Canal Gate Height 2 (ft) Canal Flow (cfs) Canal Height H of A (ft) Canal Height H of B (ft)
07/01/2017 13.04 1.31 1.01 0.54 196 3.15 2.81
07/02/2017 13.16 0.55 0.84 0.84 164 2.65 2.26
07/03/2017 13.19 0.55 0.51 0.83 141 2.33 1.88
07/04/2017 13.14 0.55 0.51 0.76 137 2.26 1.77
07/05/2017 13.12 0.55 0.51 1.25 162 2.60 2.18
07/06/2017 13.14 0.55 0.51 2.06 199 3.02 2.60
07/07/2017 13.10 1.24 0.51 2.18 237 3.53 3.15
07/08/2017 13.12 1.55 0.51 2.29 251 3.80 3.46
07/09/2017 13.07 1.56 0.51 1.17 206 3.24 2.89
07/10/2017 13.10 1.56 0.51 0.56 180 2.81 2.39
07/11/2017 13.17 1.29 0.51 0.34 151 2.51 2.13
07/12/2017 13.11 0.79 0.51 0.62 148 2.46 2.07
07/13/2017 13.25 0.79 0.51 0.65 152 2.49 2.08
07/14/2017 13.21 0.79 0.51 0.68 155 2.51 2.09
07/15/2017 13.15 0.79 0.51 0.64 154 2.51 2.11
07/16/2017 13.17 0.79 0.51 0.57 151 2.50 2.11
07/17/2017 13.18 0.79 0.50 0.46 131 2.26 1.88
07/18/2017 13.10 0.79 0.50 0.13 106 2.01 1.71
07/19/2017 13.19 0.79 0.51 0.12 104 1.97 1.64
07/20/2017 13.20 0.79 0.50 0.37 125 2.28 1.97
07/21/2017 13.13 0.79 0.50 0.35 125 2.27 1.96
07/22/2017 13.17 0.79 0.51 0.40 127 2.27 1.94
07/23/2017 13.16 0.79 0.51 0.40 127 2.27 1.94
07/24/2017 13.18 0.79 0.51 0.51 134 2.38 2.07
07/25/2017 13.18 0.79 0.50 0.83 156 2.66 2.33
07/26/2017 13.14 0.79 0.51 0.98 165 2.76 2.43
07/27/2017 13.12 0.79 0.51 1.06 166 2.75 2.41
07/28/2017 13.17 0.79 0.51 1.13 167 2.78 2.45
07/29/2017 13.11 0.79 0.51 1.22 172 2.82 2.48
07/30/2017 13.07 0.79 0.51 1.38 174 2.88 2.56
07/31/2017 13.07 0.79 0.51 1.03 156 2.63 2.29
Average 159
Maximum 251
Minimum 104
Total Volume (AF) 9,754