Vermillion Canal at Shaw Weir




Date Battery Voltage (V) Panel Temperature (degC) Canal Height (ft) Canal Flow (cfs)
02/01/2017 12.91 7.79 0.11 1
02/02/2017 12.94 5.11 0.11 1
02/03/2017 12.96 7.56 0.11 1
02/04/2017 12.90 12.40 0.11 1
02/05/2017 12.87 8.48 0.11 1
02/06/2017 12.84 8.74 0.11 1
02/07/2017 12.76 10.75 0.11 1
02/08/2017 12.77 14.21 0.11 1
02/09/2017 12.84 16.11 0.11 1
02/10/2017 12.80 14.63 0.11 1
02/11/2017 12.77 7.39 0.11 1
02/12/2017 13.10 9.48 0.11 1
02/13/2017 13.24 7.86 0.11 1
02/14/2017 13.19 8.87 0.11 1
02/15/2017 13.14 9.42 0.11 1
02/16/2017 13.08 10.31 0.11 1
02/17/2017 12.86 8.40 0.11 1
02/18/2017 12.79 9.79 0.11 1
02/19/2017 12.94 8.78 0.11 1
02/20/2017 13.15 10.99 0.11 1
02/21/2017 13.16 14.37 0.11 1
02/22/2017 13.08 11.44 0.11 1
02/23/2017 13.25 0.68 0.11 1
02/24/2017 13.09 3.29 0.11 1
02/25/2017 13.22 -1.09 0.11 1
02/26/2017 13.18 3.67 0.11 1
02/27/2017 13.06 2.51 0.11 1
02/28/2017 13.17 3.02 0.11 1
Average 1
Maximum 1
Minimum 1
Total Volume (AF) 56