Vermillion Canal at Shaw Weir




Date Battery Voltage (V) Panel Temperature (degC) Canal Height (ft) Canal Flow (cfs)
11/01/2018 13.02 7.85 0.40 7
11/02/2018 13.10 15.57 0.41 8
11/03/2018 13.22 13.18 0.41 8
11/04/2018 13.09 6.24 0.40 7
11/05/2018 13.13 11.61 0.39 7
11/06/2018 13.23 9.03 0.41 8
11/07/2018 13.19 8.60 0.39 7
11/08/2018 13.25 6.30 0.41 7
11/09/2018 13.20 6.36 0.37 6
11/10/2018 13.22 6.94 0.36 6
11/11/2018 13.20 1.29 0.38 7
11/12/2018 13.25 3.85 0.36 6
11/13/2018 13.24 5.09 0.37 7
11/14/2018 13.20 7.66 0.35 6
11/15/2018 13.19 7.94 0.37 7
11/16/2018 13.15 9.28 0.36 6
11/17/2018 13.15 9.74 0.34 6
11/18/2018 13.18 8.23 0.36 6
11/19/2018 13.18 5.15 0.36 6
11/20/2018 13.18 4.48 0.36 6
11/21/2018 13.19 6.03 0.34 6
11/22/2018 12.83 3.47 0.41 8
11/23/2018 13.07 9.39 0.43 8
11/24/2018 12.91 4.68 0.37 6
11/25/2018 13.13 1.69 0.36 6
11/26/2018 13.22 3.00 0.35 6
11/27/2018 13.12 5.00 0.34 6
11/28/2018 12.78 4.27 0.39 7
11/29/2018 12.82 6.52 0.42 8
11/30/2018 12.85 4.94 0.45 9
Average 7
Maximum 9
Minimum 6
Total Volume (AF) 405