Vermillion Canal at Shaw Weir




Date Battery Voltage (V) Panel Temperature (degC) Canal Height (ft) Canal Flow (cfs)
09/01/2017 13.03 27.58 0.57 15
09/02/2017 12.94 28.78 0.99 32
09/03/2017 12.91 28.77 0.94 29
09/04/2017 12.84 29.45 0.87 26
09/05/2017 12.87 27.22 0.80 22
09/06/2017 12.88 25.94 0.76 20
09/07/2017 12.86 25.92 0.85 25
09/08/2017 12.88 21.56 0.93 28
09/09/2017 12.82 17.14 0.97 31
09/10/2017 12.99 25.79 0.51 13
09/11/2017 12.95 27.06 0.18 2
09/12/2017 12.92 22.59 0.26 4
09/13/2017 13.00 23.56 0.28 4
09/14/2017 12.77 14.33 0.16 2
09/15/2017 12.78 13.79 0.19 3
09/16/2017 13.01 18.63 0.81 23
09/17/2017 13.03 18.16 0.71 19
09/18/2017 12.98 20.39 0.68 17
09/19/2017 13.09 21.62 0.64 15
09/20/2017 12.98 20.51 0.57 13
09/21/2017 12.96 21.21 0.54 12
09/22/2017 12.99 11.93 0.42 8
09/23/2017 12.89 7.67 0.29 4
09/24/2017 12.85 8.25 0.37 6
09/25/2017 12.92 13.77 0.43 9
09/26/2017 13.05 14.23 0.45 9
09/27/2017 12.91 17.46 0.28 4
09/28/2017 12.98 18.39 0.32 5
09/29/2017 12.91 19.80 0.33 5
09/30/2017 12.97 16.39 0.25 3
Average 14
Maximum 32
Minimum 2
Total Volume (AF) 809