Vincent Canal (McIntyre)




Date Battery Voltage (V) Canal Height (ft) Canal Flow (cfs) Canal Gate Height (ft)
07/01/2018 13.65 0.56 7.9 0.36
07/02/2018 13.63 0.55 7.8 0.37
07/03/2018 13.64 0.56 7.9 0.39
07/04/2018 13.61 0.55 7.8 0.39
07/05/2018 13.60 0.55 7.8 0.40
07/06/2018 13.58 0.75 12.7 0.67
07/07/2018 13.60 0.80 14.0 0.76
07/08/2018 13.55 0.80 14.2 0.77
07/09/2018 13.55 0.53 7.9 0.37
07/10/2018 13.62 0.33 3.5 0.13
07/11/2018 13.61 0.33 3.5 0.12
07/12/2018 13.63 0.35 3.8 0.15
07/13/2018 13.60 0.39 4.5 0.20
07/14/2018 13.69 0.39 4.5 0.22
07/15/2018 13.62 0.39 4.5 0.23
07/16/2018 13.58 0.39 4.5 0.23
07/17/2018 13.60 0.39 4.5 0.24
07/18/2018 13.61 0.39 4.5 0.23
07/19/2018 13.59 0.39 4.5 0.22
07/20/2018 13.61 0.57 8.3 0.42
07/21/2018 13.57 0.63 9.6 0.50
07/22/2018 13.64 0.65 10.0 0.49
07/23/2018 13.61 0.57 8.4 0.42
07/24/2018 13.58 0.39 4.5 0.20
07/25/2018 13.57 0.50 6.8 0.31
07/26/2018 13.63 0.61 9.1 0.41
07/27/2018 13.62 0.69 11.1 0.52
07/28/2018 13.62 0.71 11.6 0.54
07/29/2018 13.62 0.70 11.4 0.52
07/30/2018 13.61 0.70 11.4 0.55
07/31/2018 13.62 0.70 11.4 0.56
Average 7.9
Maximum 14.2
Minimum 3.5
Total Volume (AF) 483.7