Swasey Diversion




Date CCH Canal CFS (cfs) Bypass Flume CFS (cfs) Total CFS (cfs) Spill CFS (cfs) CCH Canal Height (ft) Canal Gate 1 Height (ft) Canal Gate 2 Height (ft) Max Canal Gate Height (ft) Max River Gate Height (ft) Canal Gate Height Set (ft) River Gate Height Set (ft) Bypass meter (cfs)
03/01/2018 0.00 0.13 -0.16 -0.12 -0.10 0.1
03/02/2018 0.00 0.09 -0.16 -0.12 -0.10 0.1
03/03/2018 0.00 0.05 -0.16 -0.12 -0.10 0.0
03/04/2018 0.00 0.28 -0.16 -0.12 -0.10 0.3
03/05/2018 0.00 0.22 -0.16 -0.12 -0.10 0.2
03/06/2018 0.00 0.15 -0.16 -0.12 -0.10 0.2
03/07/2018 0.00 0.09 -0.16 -0.12 -0.10 0.1
03/08/2018 0.00 0.03 -0.16 -0.12 -0.10 0.0
03/09/2018 0.00 0.06 -0.16 -0.12 -0.10 0.1
03/10/2018 0.00 0.78 -0.17 -0.12 -0.10 0.8
03/11/2018 0.00 2.82 -0.17 -0.12 -0.10 2.8
03/12/2018 0.00 2.85 -0.18 -0.12 -0.10 2.8
03/13/2018 0.00 2.85 -0.18 -0.12 -0.10 2.8
03/14/2018 0.00 2.85 -0.18 -0.12 -0.10 2.9
03/15/2018 0.00 2.98 -0.18 -0.12 -0.10 3.0
03/16/2018 0.00 3.04 -0.18 -0.12 -0.10 3.0
03/17/2018 0.00 2.98 -0.18 -0.12 -0.10 3.0
03/18/2018 0.00 3.02 -0.18 -0.12 -0.10 3.0
03/19/2018 0.00 3.47 -0.19 -0.12 -0.10 3.5
03/20/2018 0.00 3.30 -0.19 -0.12 -0.10 3.3
03/21/2018 0.00 4.87 -0.19 -0.12 -0.10 4.9
03/22/2018 0.00 5.23 -0.19 -0.12 -0.10 5.2
03/23/2018 0.00 5.35 -0.19 -0.12 -0.10 5.4
03/24/2018 0.00 4.94 -0.19 -0.12 -0.10 4.9
03/25/2018 0.00 5.07 -0.20 -0.12 -0.10 5.1
03/26/2018 0.00 5.38 -0.20 -0.12 -0.10 5.4
03/27/2018 0.00 5.09 -0.20 -0.12 -0.10 5.1
03/28/2018 0.00 4.79 -0.20 -0.12 -0.10 4.8
03/29/2018 0.00 4.62 -0.20 -0.12 -0.10 4.6
03/30/2018 0.00 5.24 -0.21 -0.12 -0.10 5.2
03/31/2018 0.00 4.90 -0.21 -0.12 -0.10 4.9
Average 0.00 0.00 2.82 0.00 2.8
Maximum 0.00 5.38 5.4
Minimum 0.00 0.03 0.0
Total Volume (AF) 0.00 0.00 173.55 0.00 173.5