Swasey Diversion




Date CCH Canal CFS (cfs) Bypass Flume CFS (cfs) Total CFS (cfs) Spill CFS (cfs) CCH Canal Height (ft) Canal Gate 1 Height (ft) Canal Gate 2 Height (ft) Max Canal Gate Height (ft) Max River Gate Height (ft) Canal Gate Height Set (ft) River Gate Height Set (ft) Bypass meter (cfs)
02/01/2019 0.00 0.31 -0.07 -0.12 -0.10 0.3
02/02/2019 0.00 0.30 -0.07 -0.12 -0.10 0.3
02/03/2019 0.00 0.30 -0.07 -0.12 -0.10 0.3
02/04/2019 0.00 0.23 -0.06 -0.12 -0.10 0.2
02/05/2019 0.00 0.23 -0.06 -0.12 -0.10 0.2
02/06/2019 0.00 0.15 -0.06 -0.12 -0.10 0.1
02/07/2019 0.00 0.20 -0.06 -0.12 -0.10 0.2
02/08/2019 0.00 0.24 -0.06 -0.12 -0.10 0.2
02/09/2019 0.00 0.40 -0.06 -0.12 -0.10 0.4
02/10/2019 0.00 1.64 -0.05 -0.12 -0.10 1.6
02/11/2019 0.00 1.69 -0.05 -0.12 -0.10 1.7
02/12/2019 0.00 2.85 -0.04 -0.12 -0.10 2.8
02/13/2019 0.00 4.01 -0.04 -0.12 -0.10 4.0
02/14/2019 0.00 4.00 -0.03 -0.12 -0.10 4.0
02/15/2019 0.00 1.83 -0.03 -0.12 -0.10 1.8
02/16/2019 0.00 4.54 -0.03 -0.12 -0.10 4.5
02/17/2019 0.00 4.44 -0.03 -0.12 -0.10 4.4
02/18/2019 0.00 3.95 -0.03 -0.12 -0.10 3.9
02/19/2019 0.00 4.11 -0.02 -0.12 -0.10 4.1
02/20/2019 0.00 4.33 -0.02 -0.12 -0.10 4.3
02/21/2019 0.00 4.35 -0.01 -0.12 -0.10 4.3
02/22/2019 0.00 4.48 -0.01 -0.12 -0.10 4.5
02/23/2019 0.00 4.42 -0.01 -0.12 -0.10 4.4
02/24/2019 0.00 3.84 0.00 -0.12 -0.10 3.8
02/25/2019 0.00 3.67 0.00 -0.12 -0.10 3.7
02/26/2019 0.00 3.12 0.00 -0.12 -0.10 3.1
02/27/2019 0.00 2.14 0.00 -0.12 -0.10 2.1
02/28/2019 0.00 0.54 0.00 -0.12 -0.10 0.5
Average 0.00 0.00 2.37 0.00 2.3
Maximum 0.00 4.54 4.5
Minimum 0.00 0.15 0.1
Total Volume (AF) 0.00 0.00 131.49 0.00 130.3