Cottonwood Steel Pipeline




Date Pipeline Flow (cfs) Acre Feet (AF)
11/01/2018 10.36 20.55
11/02/2018 6.87 13.62
11/03/2018 1.75 3.48
11/04/2018 2.03 4.02
11/05/2018 2.25 4.46
11/06/2018 5.77 11.44
11/07/2018 10.06 19.95
11/08/2018 10.11 20.05
11/09/2018 10.05 19.93
11/10/2018 10.06 19.95
11/11/2018 10.20 20.23
11/12/2018 10.16 20.15
11/13/2018 10.06 19.95
11/14/2018 7.46 14.80
11/15/2018 5.01 9.95
11/16/2018 5.04 9.99
11/17/2018 5.10 10.12
11/18/2018 5.09 10.09
11/19/2018 5.08 10.07
11/20/2018 5.05 10.02
11/21/2018 5.06 10.03
11/22/2018 5.24 10.40
11/23/2018 5.24 10.39
11/24/2018 5.27 10.46
11/25/2018 5.15 10.22
11/26/2018 5.09 10.10
11/27/2018 5.24 10.39
11/28/2018 5.31 10.52
11/29/2018 5.34 10.59
11/30/2018 5.30 10.52
Average 6.33
Maximum 10.36
Minimum 1.75
Total Volume (AF) 376.37