Cottonwood Steel Pipeline




Date Pipeline Flow (cfs) Acre Feet (AF)
04/01/2017 0.36 0.70
04/02/2017 0.35 0.69
04/03/2017 0.35 0.70
04/04/2017 0.35 0.68
04/05/2017 0.34 0.66
04/06/2017 0.32 0.64
04/07/2017 0.36 0.72
04/08/2017 0.38 0.75
04/09/2017 0.34 0.67
04/10/2017 0.34 0.67
04/11/2017 0.35 0.68
04/12/2017 0.33 0.66
04/13/2017 0.34 0.67
04/14/2017 0.33 0.66
04/15/2017 0.34 0.68
04/16/2017 0.34 0.67
04/17/2017 0.37 0.73
04/18/2017 0.36 0.72
04/19/2017 0.34 0.67
04/20/2017 0.36 0.72
04/21/2017 0.35 0.70
04/22/2017 0.33 0.65
04/23/2017 0.35 0.69
04/24/2017 0.38 0.76
04/25/2017 0.36 0.72
04/26/2017 0.35 0.69
04/27/2017 0.36 0.72
04/28/2017 0.35 0.70
04/29/2017 0.35 0.69
04/30/2017 0.32 0.64
Average 0.35
Maximum 0.38
Minimum 0.32
Total Volume (AF) 20.72