Cottonwood Steel Pipeline




Date 2017 Pipeline Flow (cfs) 2017 Acre Feet (AF)
12/01/2017 3.71 7.35
12/02/2017 4.04 8.02
12/03/2017 0.52 1.02
12/04/2017 0.48 0.94
12/05/2017 0.46 0.91
12/06/2017 0.46 0.91
12/07/2017 0.47 0.94
12/08/2017 0.45 0.89
12/09/2017 0.44 0.88
12/10/2017 0.44 0.88
12/11/2017 0.44 0.88
12/12/2017 0.87 1.73
12/13/2017 4.41 8.74
12/14/2017 3.24 6.42
12/15/2017 3.46 6.85
12/16/2017 3.43 6.80
12/17/2017 7.88 15.62
12/18/2017 8.28 16.42
12/19/2017 7.17 14.21
12/20/2017 5.98 11.86
12/21/2017 6.98 13.84
12/22/2017 5.94 11.79
12/23/2017 7.61 15.10
12/24/2017 9.63 19.10
12/25/2017 9.50 18.84
12/26/2017 9.96 19.76
12/27/2017 8.68 17.22
12/28/2017 7.27 14.43
12/29/2017 5.11 10.13
12/30/2017 2.40 4.77
12/31/2017 3.45 6.84
Average 4.30
Maximum 9.96
Minimum 0.44
Total Volume (AF) 264.06